Welcome to"Suzhou Doer Gas & Chemical Equipment Co., Ltd" website!

Hotline: +86 512-81666096
0512-66182570

Hotline

+86 512-81666096
Industry

Now:Home > News > Industry

88,Doer company's instructions for equipment design change and material substitution - Doer equipment

Classification:Industry PublishTime:2019-10-26 14:16:23

Dur's explanation of equipment design change and material substitution


★ Design change refers to the notice of design change issued by the design unit or on-site design representative, which shall be regarded as formal design document and implemented seriously. After receiving the design change, the project chief engineer or the chief of the engineering technology section shall timely distribute it to the engineering technicians and relevant departments. For the design changes that have not yet been implemented in the project, the engineering and technical personnel shall timely make records, change technical disclosure and adjust the engineering material budget, and organize the implementation according to the design changes; For the design changes that have been implemented in the project, while doing the above work well, the engineering and technical personnel shall timely contact the site representative of the construction unit or the supervision unit, and handle the site visa for the quantities that need to be reworked according to the actual situation;


★ The application for material substitution is made when the supplier or construction unit fails to provide the specified materials according to the design technical requirements, which can be implemented as the same as the design technical documents only after being approved by the design unit or on-site design representative. The application for substitution of self supplied materials shall be submitted to the design unit for approval after consulting the engineering and technical personnel. After receiving the material substitution list, the engineering and technical personnel shall make records, adjust the material budget and inform the participating units in time;


★ The chief of the project engineering section shall be responsible for receiving, issuing and filing the design change and material substitution documents. All engineering and technical personnel shall fill in the form of "design change / material substitution record" in the company's document "compilation of construction record forms".


6.8 technical contact list


★ The technical contact list is used for the modification matters proposed by the construction unit, which can be implemented only after the approval of the original design unit or the construction unit. The technical contact list approved by the original design unit or the construction (supervision) unit can be regarded as the design technical documents;


★ The site representative of the construction unit in the technical contact list shall be the professional engineer of the project engineering department or the construction worker of the construction team; The technical director shall be the chief engineer of the project or the chief of the engineering technology section, and shall be uniformly numbered and stamped with official seal before being registered and issued by the documenter.


★ The returned technical contact form must be signed with clear opinions, signed and sealed by the design unit or the site representative of the relevant unit. It shall be received by the documenter and approved by the chief engineer of the project or the chief of the engineering technology section, and then registered and issued to the relevant unit for implementation.


Home Product Case Top