Welcome to"Suzhou Doer Gas & Chemical Equipment Co., Ltd" website!

Hotline: +86 512-81666096
0512-66182570

Hotline

+86 512-81666096
Industry

Now:Home > News > Industry

106,Preparation before construction of large atmospheric storage tank (2) - Doer equipment

Classification:Industry PublishTime:2019-11-07 13:39:20

Preparation before construction of large atmospheric storage tank (2)


Construction technology training: the technical training should be done well in the preparation stage of tank construction, as shown in the table below:


List of construction technology training:


Foundation acceptance: before the tank bottom plate is laid, the tank foundation shall be accepted. If it is found to be unqualified, it shall be handled in time. The quality standard of foundation acceptance is shown in the following table:

The foundation shall be provided with settlement observation points, which shall be recorded at the time of handover, and the observation points shall be remeasured and recorded.



Home Product Case Top